Map showing past improvements to the PA 28/PA 8 interchange in Pittsburgh.
Allegheny River
Allegheny River
EXIT
EXIT
Allegheny Valley Expressway (Northbound)
Allegheny Valley Expressway (Northbound)
8
8
Senator Robert D. Fleming/ 62nd Street Bridge
Senator Robert D. Fleming/
62
nd Street Bridge
8
8
EXIT
EXIT
PHASE 1 Extended and rebuilt the PA 28 south ramp to PA 8 nor...
PHASE 1
Extended and rebuilt the PA
28
south ramp to PA
8
north
.
Began
:
8
/
16
/
1999
Concluded
:
1
/
11
/
2000
Cost
:
$
4
.
7
million
Shaler Waterworks
Shaler Waterworks
Pittsburgh Zoo PPG Aquarium
Pittsburgh Zoo
PPG Aquarium
28
28
PHASE 3 Widened and rebuilt the southbound side near Exit 6. ...
PHASE 3
Widened and rebuilt the southbound side
near Exit
6
.
The ramp from PA
8
south to PA
28
south was closed during project
.
Began
:
4
/
26
/
2004
Concluded
:
3
/
17
/
2005
Cost
:
$
26
.
5
million
Allegheny Valley Expressway (Southbound)
Allegheny Valley Expressway (Southbound)
28
28
PHASE 5 Rebuilt PA 28 northbound between Butler Street and th...
PHASE 5
Rebuilt PA
28
northbound
between Butler Street and the
62
nd Street Bridge
.
Began
:
3
/
15
/
2010
Concluded
:
12
/
3
/
2010
Cost
:
$
27
.
2
million
PHASE 2 Rebuilt the southbound overpass to accommodate two la...
PHASE 2
Rebuilt the southbound
overpass to accommodate
two lanes
.
Began
:
4
/
10
/
2001
Concluded
:
12
/
10
/
2001
Cost
:
$
11
.
5
million
PHASE 4 Rebuilt the northbound overpass to accommodate two la...
PHASE 4
Rebuilt the northbound
overpass to
accommodate two lanes
.
Began
:
6
/
7
/
2009
Concluded
:
11
/
25
/
2009
Cost
:
$
22
.
5
million
Copyright 2010 Jeffrey J. Kitsko Pittsburgh Highways: https...
Copyright
2010 Jeffrey J. Kitsko
Pittsburgh Highways
: https://pittsburgh.pahighways.com
Pittsburgh
Pittsburgh
Kittanning
Kittanning
Highland Park
Highland Park
Butler
Butler
Interchange Reconstruction
Interchange Reconstruction